Development Program

PFS Work Program

The ongoing work includes:

  • Optimisation of mine plan
    • To maximise head grade in the first few years
    • Demonstrate operational workflow for various project sizes
  • Metallurgical test work
    • Confirm the recovery in first few years
    • Generate geo-metallurgical model for life of mine
  • Location of mine infrastructure
    • Review options for the

Environmental Work Program

  • Environmental base line studies
    • Undertake all base line studies in preparation for 2020 EIA
    • Generate hydrological models

© 2019 Los Andes Copper Ltd.
All rights reserved.
Disclaimer

Subscribe to our Email List